Barbican Renewal Programme - Metalwork including feature stairs
The Mayor and Commonalty and Citizens of the City of London · no closing date published
What this tender is
The Mayor and Commonalty and Citizens of the City of London is seeking suppliers for “Barbican Renewal Programme - Metalwork including feature stairs”. It is classed as construction & building works, with delivery in London.
In the buyer's own words: Barbican Renewal Programme - Metalwork Including Feature Stairs The package covers the design, supply and installation of architectural metalwork and feature stairs across six work areas: the Conservatory (CN), Stair 8 (S8), the Art Gallery Foyers (AF), the Foyers (FY), the Catering Block (CB) and Infrastructure (IN). The items are a mix of new, proprietary and refurbished heritage metalwork, and the Conservatory stairs, balustrades and walkways are the largest part of the package. The scope within each area is summarised below: • Conservatory (CN) – feature stairs: Free-standing Helical and…
The tender is being run under a selective procedure, where the buyer shortlists suppliers before inviting bids.
The estimated value is £5.5m, as stated by the buyer; the final value can differ.
Ktenders places each notice in a trade from the classification code the buyer chose and in a region from the delivery location it gives, so if the scope looks different from the trade shown here, the official notice is the one to trust.
Who it suits
This tender is most relevant to construction & building suppliers able to deliver in London.
At this size buyers usually expect evidence of similar work, appropriate insurance and stable finances, so smaller firms often bid as part of a consortium or as a subcontractor.
Public buyers in the UK must treat suppliers equally and explain how bids will be scored, so the selection and award criteria in the tender documents are the best guide to whether this opportunity is worth your time.
Before deciding to bid, read the full notice and any attached documents: they set out the exact requirements, selection criteria and how bids will be scored.
Key dates
The notice was published on 9 November 2026.
The buyer has not published a closing date in this notice. It may be an early notice of work to come, so check the official notice for the timetable and register your interest with the buyer.
Most buyers set a cut-off for clarification questions a few days before the deadline, and the answers are usually shared with every bidder on the buyer's portal.
Deadlines on public tenders are strict: late submissions are normally rejected, so allow time for clarification questions and for uploading your response on the buyer's portal.
Original notice text
Barbican Renewal Programme - Metalwork Including Feature Stairs
The package covers the design, supply and installation of architectural metalwork and feature stairs across six work areas: the Conservatory (CN), Stair 8 (S8), the Art Gallery Foyers (AF), the Foyers (FY), the Catering Block (CB) and Infrastructure (IN). The items are a mix of new, proprietary and refurbished heritage metalwork, and the Conservatory stairs, balustrades and walkways are the largest part of the package. The scope within each area is summarised below:
• Conservatory (CN) – feature stairs: Free-standing Helical and Spiral stairs, and the West, East and South ground-bearing stairs, with their balustrades and the helical stair void guarding and gate.
• Conservatory (CN) – balustrades, gates and handrails: new glazed and planter balustrades to the flytower walkways, viewing platform, landscape and entrance ramp; refurbishment of the Arid House balcony and Level 06 flytower walkway balustrades; guarding to automated doors; gates; and brass handrails to ramps and steps.
• Conservatory (CN)– walkways and ladders: repairs to the existing access stair, platform and walkway; the duct-protection walkway; the Tower Walkway floor grille; The Ledge access platform; and the Shaft 20 access ladder and extendable pole.
• Conservatory (CN) – linings, fixtures and louvres: lift architraves, stainless linings, fascias, floor hatches, Theatre Fans louvred doors and screens, the Sculpture Court louvre screen, fin-tube heater brackets fixed to concrete, brass armrests, propagation benches, climber mesh, planters and the Nursery plant shelter; metal planter and lattice soffit repair; and new standalone mechanical louvres and refurbished vent panels fitted into existing openings.
• Stair 8 (S8): refurbished balustrade with new glass; the Stair 8 façade handrail removed, refurbished and refitted with LED lighting; and a perforated deck.
• Art Gallery Foyers (AF): refurbished mechanical louvres; and, to the Level 03 balconies, a new glazed balustrade and gate and bespoke metal planters.
• Foyers (FY) : hoop barriers, brass skirting, a goods-lift door, a brass mesh screen, recreated, refurbished and new balustrades, brass handrails, an access slope, foot-pump covers, drink shelves, cycle stands, refurbished louvres, and brass and hose reel cover plates. The brass handrail at the glazing is refurbished by TP4750 and free-issued to TP3300 Glazing and Envelop contractor for refitting.
• Catering Block (CB): offsite repair and reinstatement of the Level 1 balustrade; a new Level 2 balustrade inside the glazing, demountable for glazing access; a brass hoop barrier; and a terrace planter.
• Infrastructure (IN): plant fencing and gates, a loading bay gate, plantroom guarding, a fire-rated plant enclosure, ductwork panelling, the Service Road grille, and shaft-top louvre and bird mesh.
Design Responsibility
The package’s bespoke architectural metalwork and feature stair systems are Contractor Design Portion. The design team specifications set performance requirements and design intent only; the Contractor develops that intent into a complete, buildable design, including structural calculations, fabrication and shop drawings, connection design back to the primary and secondary structure, the Building Regulations approvals that depend on them, and coordination at every interface with adjoining trades. Naming a specific product or finish does not relieve the Contractor of that responsibility.
This includes the full structural design of the Helical, Spiral, West, East and South feature stairs; structural adequacy and loading design for all balustrades, guarding, working platforms and walkways, including permanent fall-restraint systems and their certification; and a condition-survey-led repair method and specification for every refurbishment item.
More construction & building tenders
Closes tomorrow at 23:59
2 days left
3 days left
3 days left
3 days left
More tenders in London
3 days left
3 days left
3 days left
3 days left
3 days left
3 days left
Closing soon
Closes today at 17:00
Closes tomorrow at 12:00
Closes tomorrow at 16:00
3 days left
3 days left
3 days left