Manchester International Airport Phase 2 - Overbridge Civils

Kier Transportation - CP7 NWC · Closed 30 October 2026

What this tender is

Kier Transportation - CP7 NWC is seeking suppliers for “Manchester International Airport Phase 2 - Overbridge Civils”. It is classed as construction & building works, with delivery in North West.

The notice uses CPV code 45233210 (Surface work for highways), the common classification buyers use across the UK and Europe, which is how Ktenders places it in the construction & building trade.

In the buyer's own words: The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and…

The procedure and any lots are set out in full on the official notice.

The estimated value is £1m, as stated by the buyer; the final value can differ.

Ktenders places each notice in a trade from the classification code the buyer chose and in a region from the delivery location it gives, so if the scope looks different from the trade shown here, the official notice is the one to trust.

Who it suits

This tender is most relevant to construction & building suppliers able to deliver in North West.

The buyer has flagged it as suitable for small and medium-sized enterprises (SMEs).

At this size buyers usually expect evidence of similar work, appropriate insurance and stable finances, so smaller firms often bid as part of a consortium or as a subcontractor.

Public buyers in the UK must treat suppliers equally and explain how bids will be scored, so the selection and award criteria in the tender documents are the best guide to whether this opportunity is worth your time.

Before deciding to bid, read the full notice and any attached documents: they set out the exact requirements, selection criteria and how bids will be scored.

Key dates

The notice was published on 23 October 2026.

Responses are due by 17:00 UK time on 30 October 2026, and that deadline has now passed.

Most buyers set a cut-off for clarification questions a few days before the deadline, and the answers are usually shared with every bidder on the buyer's portal.

Deadlines on public tenders are strict: late submissions are normally rejected, so allow time for clarification questions and for uploading your response on the buyer's portal.

Original notice text

The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport.

The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP):

A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services.

The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions.

The works comprise the construction and completion of the bridge structure and associated highway infrastructure, including:

• Installation of client-supplied precast bridge components, including cills, beams and side walls, together with associated shear key reinforcement and grout connections.

• Modification of existing bridge cill.

• Supply and installation of bridge bearing plates, including associated screed works.

• Construction of pile caps/infill.

• Placement of in-situ concrete shear key infill.

• Construction of the reinforced concrete bridge deck slab.

• Construction of reinforced concrete parapet walls.

• Placement of in-situ concrete footpaths and fill areas.

• Construction of pilasters, including reinforced concrete and brickwork elements.

• Supply and installation of parapet and pilaster copings.

• Construction of associated fencing, signage and PCC retaining wall.

• Installation of associated ducting works.

• Completion of highway works excluding final road surfacing.

• Application of bridge waterproofing systems, installation of expansion joints, and completion of associated sealing and mastic works.

• Construction of associated drainage works.

Exclusions: Final road/footpath surfacing works are excluded from this scope.

More construction & building tenders

All construction & building tenders →

More tenders in North West

Family Time

Wirral Council · North West · closes 24 Nov

4 days left

All tenders in North West →

Closing soon

All live tenders by trade →