SZC CWA - Pool Bunker Construction

Sizewell C Limited · Closes 14:30 on 25 November 2026 · 5 days left

What this tender is

Sizewell C Limited is seeking suppliers for “SZC CWA - Pool Bunker Construction”. It is classed as construction & building goods, with delivery across the UK or not tied to one region.

The notice uses CPV code 45210000 (Building construction work), the common classification buyers use across the UK and Europe, which is how Ktenders places it in the construction & building trade.

In the buyer's own words: The contract will deliver a commissioned, weathertight and operational Pool Bunker above the base slab. The facility will support assembly, welding and inspection activities before modules are transferred to the Nuclear Island. The scope of works includes: • Primary steel frame and crane runway beams. • Rainscreen cladding and industrial doors, with precast cladding retained as the alternative envelope. • Five-section retractable roof. • Secondary steelwork platforms, working levels and access arrangements. • Mechanical, electrical and public health services, including local exhaust…

The procedure and any lots are set out in full on the official notice.

The estimated value is £20m, as stated by the buyer; the final value can differ.

Ktenders places each notice in a trade from the classification code the buyer chose and in a region from the delivery location it gives, so if the scope looks different from the trade shown here, the official notice is the one to trust.

Who it suits

This tender is most relevant to construction & building suppliers able to deliver across the UK or not tied to one region.

The buyer has flagged it as suitable for small and medium-sized enterprises (SMEs).

At this size buyers usually expect evidence of similar work, appropriate insurance and stable finances, so smaller firms often bid as part of a consortium or as a subcontractor.

Public buyers in the UK must treat suppliers equally and explain how bids will be scored, so the selection and award criteria in the tender documents are the best guide to whether this opportunity is worth your time.

Before deciding to bid, read the full notice and any attached documents: they set out the exact requirements, selection criteria and how bids will be scored.

Key dates

The notice was published on 19 November 2026.

Responses are due by 14:30 UK time on 25 November 2026, which is 5 days from today.

Most buyers set a cut-off for clarification questions a few days before the deadline, and the answers are usually shared with every bidder on the buyer's portal.

Deadlines on public tenders are strict: late submissions are normally rejected, so allow time for clarification questions and for uploading your response on the buyer's portal.

Original notice text

The contract will deliver a commissioned, weathertight and operational Pool Bunker above the base slab. The facility will support assembly, welding and inspection activities before modules are transferred to the Nuclear Island.

The scope of works includes:

• Primary steel frame and crane runway beams.

• Rainscreen cladding and industrial doors, with precast cladding retained as the alternative envelope.

• Five-section retractable roof.

• Secondary steelwork platforms, working levels and access arrangements.

• Mechanical, electrical and public health services, including local exhaust ventilation, power, lighting and controls.

• Passenger and goods hoists, stair cores and roof access.

• Installation and commissioning of three free-issued gantry cranes.

• Tented workshop, lightning protection and earthing.

• Testing, commissioning, quality records and formal handover.

The base slab and the separate site non-destructive testing contract are outside this sourcing strategy. Their interfaces will be defined in the tender documents and managed through the contract programme.

The key scope deliverables are:

• Completed design to RIBA stage 4 and coordinated construction information.

• Approved contractor programme aligned to project milestones.

• Constructed and commissioned Pool Bunker, including roof, cranes, platforms, access and building services.

• Completed health, safety, quality and assurance records.

• Demonstrated interfaces with the base slab, utilities and non-destructive testing arrangements.

• Formal handover following operational readiness review.

The timescales are as follows:

The Pool Bunker is required to support the planned assembly, welding and inspection of pool and tank liner modules before transfer to the Nuclear Island. The current estimated site construction period is:

• 40 weeks for the preferred rainscreen and Safe RAD solution.

• 46 weeks for the 275 mm precast fallback solution.

The current target is for the Pool Bunker to be completed and handed over by 28 February 2028, ready to support the planned assembly, welding and inspection of pool and tank liner modules. The programme is dependent on completion of the base slab and availability of the K10 area and will be revalidated once the K10 release date is confirmed.