BIP SOLUTIONS LIMITED is seeking suppliers for “Provision of UPS - MEICA-UPS-01”. It is classed as vehicles & fleet goods, with delivery in West Midlands.

The notice uses CPV code 34632300 (Electrical installations for railways), the common classification buyers use across the UK and Europe, which is how Ktenders places it in the vehicles & fleet trade.

In the buyer's own words: The Subcontractor shall design, manufacture, supply, deliver, test and commission 4 No. complete UPS systems: 1 No. at Stoneleigh, 1 No. at Canley Brook and 2 No. at Burton Green. 1. Technical Requirements Each UPS shall be rated at 210 kVA, 400 V, with 4 x 60 kW power modules and N+1 hot-swappable architecture. The Subcontractor shall demonstrate that the required connected load remains supported with one power module unavailable. Requirement Stoneleigh Canley Brook Burton Green Battery sizing load 35 kW 17 kW 70 kW Connected design load 31 kW TBC 66 kW Protection breaker 100 A 100 A 250 A…

The procedure and any lots are set out in full on the official notice.

The estimated value is £500k, as stated by the buyer; the final value can differ.

Ktenders places each notice in a trade from the classification code the buyer chose and in a region from the delivery location it gives, so if the scope looks different from the trade shown here, the official notice is the one to trust.

Who it suits

This tender is most relevant to vehicles & fleet suppliers able to deliver in West Midlands.

At this size buyers usually expect evidence of similar work, appropriate insurance and stable finances, so smaller firms often bid as part of a consortium or as a subcontractor.

Public buyers in the UK must treat suppliers equally and explain how bids will be scored, so the selection and award criteria in the tender documents are the best guide to whether this opportunity is worth your time.

Before deciding to bid, read the full notice and any attached documents: they set out the exact requirements, selection criteria and how bids will be scored.

Key dates

The notice was published on 19 November 2026.

Responses are due by 14:55 UK time on 25 November 2026, which is 5 days from today.

Most buyers set a cut-off for clarification questions a few days before the deadline, and the answers are usually shared with every bidder on the buyer's portal.

Deadlines on public tenders are strict: late submissions are normally rejected, so allow time for clarification questions and for uploading your response on the buyer's portal.

Original notice text

The Subcontractor shall design, manufacture, supply, deliver, test and commission 4 No. complete UPS systems: 1 No. at Stoneleigh, 1 No. at Canley Brook and 2 No. at Burton Green.

1. Technical Requirements

Each UPS shall be rated at 210 kVA, 400 V, with 4 x 60 kW power modules and N+1 hot-swappable architecture. The Subcontractor shall demonstrate that the required connected load remains supported with one power module unavailable.

Requirement Stoneleigh Canley Brook Burton Green

Battery sizing load 35 kW 17 kW 70 kW

Connected design load 31 kW TBC 66 kW

Protection breaker 100 A 100 A 250 A

Separate static switch N/A N/A 400 A, 400 V

Each UPS shall provide an output fault current of 987 A for 200 ms. Supplier submissions shall demonstrate compatibility with the project protection requirements.

2. Batteries

Provide complete VRLA battery systems, including racks/enclosures, interconnections, isolation and protection, delivering 90 minutes' autonomy at the specified battery sizing load. Batteries shall recharge to 95% within 900 minutes. Submit sizing and recharge calculations.

3. Transformers and Ancillary Equipment

Provide 250 kVA, 1:1, Dzn0 input and output isolation transformers, together with ATS, static switching and external maintenance bypass arrangements required by the approved site-specific drawings. ATS shall be 400 A, four-pole where indicated.

Include all interconnecting cables, battery cables, protective devices and terminations identified as the UPS supplier's responsibility. Coordinate interfaces with incoming supplies and UPS switchboards.

4. Monitoring

Provide BMS interfaces for battery DC voltage, charge percentage, battery alarms/faults and charger status/alarms. Include communications protocols, interface hardware and point schedules for the UPS, ATS and UPS switchboard, with interface testing.

5. Delivery and Coordination

Scheduled UPS cabinet dimensions are 1,200 W x 1,996 H x 1,100 D mm. Confirm complete equipment footprints, weights, clearances and delivery requirements before manufacture.

6. Testing and Handover

Include FAT, commissioning, SAT and resistive load bank testing, with all temporary equipment, connections and removal. Demonstrate capacity, autonomy, recharge, redundancy, transfer/bypass operation, alarms and communications. Provide evidence of fault-current performance.

Submit equipment drawings, schematics, protection data, test procedures/results, commissioning records, as-built information and O&M manuals.

Suppliers shall identify proposed equipment and deviations. Confirm the missing Canley Brook design load, whether Burton Green loads apply per UPS, and site-specific equipment quantities and supply boundaries before manufacture.

Additional information: Please review attached schematic and narrative specification.